Built 50 years ago and reconstructed 30 years ago, the old bridge at Smith Rock State Park in Terrabonne, Oregon needed updates to accommodate visitors and first responders during the park’s frequent rescue operations. This project was scheduled for September 22, 2023, to remove the old bridge and replace it with a new, wider pedestrian bridge.
As part of the replacement, new bridge abutments were designed to be supported by driven pipe piles. The general contractor used a crane to lift one of TerraFirma’s mini excavators over the river so the team could use it and a hydraulic breaker with a special attachment to drive the 3” pipe pile.
Project Summary
Crew Leader: Samuel Golsan
Crew Leader: Michael Tomaras
Lead Installer: Taylor Day
Installer: Arturo Rojo
Roseburg, OR
TerraFirma Foundation Systems
7700 Old Highway 99 N
Roseburg, OR 97470
Portland, OR
TerraFirma Foundation Systems
13110 SW Wall St
Portland, OR 97223
Tacoma, WA
TerraFirma Foundation Systems
10111 S Tacoma Way D5
Tacoma, WA 98499
Vancouver, WA
TerraFirma Foundation Systems
2001 NE 117th ST
Vancouver, WA 98686
CCB# 173547
WA: TERRAFR931LH
Copyright © 2025 JAST Media. All Rights Reserved | Privacy Policy | Terms of Use